READING / OPERATOR DRAFT

Make the first Reading participation proposal concrete.

Keep the established project and ownership basis. Add the delivering party, unit pool and beneficiary terms to download a complete draft and content checksum.

Already set: Reading solar and battery, UK, existing ZEV asset contribution

Ownership basis: ZEV operator confirmation of actual ownership on 26 November 2026. This form does not ask to reconfirm ownership or relabel existing asset contribution as AI-service surplus.

Input and file processing stay in this browser. Nothing is uploaded or automatically saved. Download your draft before leaving.

1. Who delivers what

Reading and the ZEV ownership basis are already set. Define the proposed delivery arrangement here.

Name the party actually responsible for delivery; not automatically the service operator.
Use a checkable internal reference, not credentials.
Describe the specific exercisable right, not just a token name.
Define the asset or right, scope and period represented by the denominator.
2. How much is available

Use whole units. Blank means unresolved, not zero. Historical cost, generation in kWh and £10 test credit are not converted into an ownership fraction.

Reference the ledger or review document. This form does not authenticate it.
3. For whom, on which terms

Prepare a readable proposal first. Identity verification and beneficiary consent happen separately.

Use an internal reference. No identity documents, email or wallet secrets are needed. Identity mapping is separate.
Keep the exact text the beneficiary will read, including applicable rights, costs, term and transfer or exit arrangements. Maximum 16,000 UTF-8 bytes.
Specify the contact or process and a checkable delivery record.

You can prepare a partial draft. Missing information stays unresolved; it is never automatically confirmed.