READING / OPERATOR DRAFT
Make the first Reading participation proposal concrete.
Keep the established project and ownership basis. Add the delivering party, unit pool and beneficiary terms to download a complete draft and content checksum.
Ownership basis: ZEV operator confirmation of actual ownership on 26 November 2026. This form does not ask to reconfirm ownership or relabel existing asset contribution as AI-service surplus.
Input and file processing stay in this browser. Nothing is uploaded or automatically saved. Download your draft before leaving.
You can prepare a partial draft. Missing information stays unresolved; it is never automatically confirmed.
Draft for review
This file is not beneficiary consent, a rights transfer or an execution instruction. Complete fields mean the input and integer arithmetic are ready for review, not that rights or inventory have been verified.
Content checksum, not a ZEV signature